Added in the revised deck (2026-10-31). Claims are listed in claims.yaml.

Findings (checked 2026-10-31)

The slide is broadly right. Main problems: 1. The Colossus 2 numbers (27 turbines, about 1,700 t NOx) date from the April 2026 complaint. The complaint says "approximately" 1,700 t, as a potential to emit; "more than 1,700" is SELC's and Earthjustice's wording. SELC's Oct. 2026 release gives higher emission figures (>5,000 t NOx) but no new turbine count; it called the 27-turbine fleet "dozens" in April too. 2. The recycling plant has a promised restart date (Q1 2027), and it treats Maxson wastewater rather than sitting at Maxson. 3. The "Unpaid Toll" figures are scenario projections in every version: v1 (2024) uses McKinsey's medium-growth case for 2030; v4 (2026) uses its high-growth case for 2028. Costs are "up to more than $20B". 4. "Data centers reach 945 TWh by 2030" is an IEA projection, not a fact.

Correction (2026-10-31, after review): earlier text here said the Colossus 2 fleet "has grown beyond 27" and that the suit alleges "more than 1,700 tons". Neither is supported by the sources; both are fixed below.

The emissions and turbine figures are allegations made by the NAACP and its counsel. The Oct. 30, 2026 order denied a motion to dismiss; it did not decide liability.

Claim Verdict Key evidence Suggested wording
c1 IEA: more than double, ~3%, Japan, 945 TWh supported IEA press release (verbatim reprint): "more than double by 2030 to around 945 TWh, slightly more than ... Japan today" (F01, F02); "just under 3%" (F03, F04); 945/415 = 2.28x. iea.org itself blocked us (403 challenge) "…to just under 3% of the world total, about what Japan uses today (IEA, 2025)"
c2 35 turbines at Colossus 1; 27 at Colossus 2; 1,700+ t NOx partially supported 35 is from SELC (F06). The court order recites the complaint: ≥27 turbines, ≥495 MW (unit mix sums to 495), potential to emit "approximately 1,700 tons" NOx (F08, F33, F09). "More than 1,700" is counsel's wording (F35). SELC's Oct. figures are higher (>5,000 t, F11) but give no count; "dozens" was used for 27 in April too (F34) "Colossus 2 is powered by unpermitted turbines in Mississippi: the April 2026 suit names 27 and alleges they could emit about 1,700 tons of NOx a year."
c3 Aquifer; 3.7 MGD requested; plant stalled April 2026 supported E&E News/Politico, citing MLGW (F17–F19). Restart promised by Q1 2027 (WWD, June 2026, F21) Add "xAI now says it will restart in early 2027."
c4 (notes) 1,300 deaths, 600,000 asthma cases, $20B, by 2030 partially supported v1 (2024): 2030, McKinsey medium-growth case, "up to more than $20 billion" (F24, F37, F38). v4 (June 2026, retitled "Health-Informed Computing"): 2028, high-growth case, "1,300 premature deaths", "up to more than $20 billion" (F25, F26, F39, F40). Both are scenarios; cost is not "close to" $20B; cases are "asthma symptom cases" "In a high-growth scenario … could cause about 1,300 premature deaths and 600,000 asthma symptom cases in 2028, with health costs of up to more than $20B (Han et al., preprint, rev. 2026)"
c5 Jevons, 1865 supported Ch. VII: "wholly a confusion of ideas … The very contrary is the truth"; Watt's inventions were "modes of economising heat" (F27–F30). The link to AI is the speaker's analogy, and 945 TWh is an IEA projection (F01) "AI may be doing the same: the IEA projects data centers will use about 945 TWh by 2030."
c6 (notes, new) 27 turbines, 495 MW, ½ mile from homes, 1,700 t NOx, 180 t PM, 19 t formaldehyde partially supported Match the complaint as the court recites it ("approximately", potential to emit), plus Earthjustice for the distances (F08, F33, F09, F12). "More than 1,700" / "up to 180" are Earthjustice's words (F35). Should be framed as allegations dated April 2026 (F11) "at least 27 (495 MW) when the NAACP sued in April 2026. The complaint alleges they could emit about 1,700 t NOx, 180 t fine particulates and 19 t formaldehyde a year."
c7 (notes, new) NAACP suit; MTD denied Oct. 30, 2026 supported Opinion and Order, N.D. Miss. No. 3:26-cv-74, Doc. 139, signed by Judge Brown (F13–F15). A DOJ motion was denied "shortly" before, per SELC; no date given (F36) Keep; say this was a motion-to-dismiss ruling
c8 (notes, new) ALA F for ozone partially supported SELC only (F16). The ALA pages load grades by script, so we could not read them Check lung.org in a browser
c9 (notes, new) Colossus 1 since June 2024; removed turbines, 15 permitted supported (SELC account) F06, F07 Keep, credit SELC
c10 (notes, new) Maxson recycling plant, permit Jan. 2026, 13 MGD, paused April 2026 partially supported Memphis Flyer citing TDEC (F22, F23); pause from E&E News (F18). The plant treats Maxson effluent; it is not described as at Maxson "A recycling plant to treat T.E. Maxson wastewater…"

Not checked

Reproduce

uv run python slides/08-power-water-health/src/01_fetch.py   # fetch + log sources (MANIFEST.yaml)
uv run python slides/08-power-water-health/src/02_check.py   # verify facts.csv quotes; computed.csv

Sources are saved in data/raw/sources/ (gitignored). The quote check normalises whitespace, curly quotes and dashes.

Claims

ClaimStatusKind
c1Global data-center power use projected to more than double by 2030, roughly 3% of total electricity, equal to Japan; 945 TWh by 2030
Suggested: Global data-center electricity use is projected to more than double by 2030, to just under 3% of the world total, about what Japan uses today (IEA, 2025).
✅ supportedquantitative
c2xAI ran up to 35 unpermitted gas turbines at Colossus 1; 27 unpermitted power Colossus 2; up to 1,700+ tons of NOx a year
Suggested: xAI ran up to 35 unpermitted gas turbines at Colossus 1 in Memphis. Colossus 2 is powered by unpermitted turbines in Mississippi: the April 2026 suit names 27 and alleges they could emit about 1,700 tons of smog-forming NOx a year.
🟧 partially-supportedquantitative
c3Colossus cooling draws on the Memphis Sand Aquifer; up to 3.7 million gallons a day requested; recycling plant stalled April 2026
Suggested: Cooling draws on the Memphis Sand Aquifer, the city’s drinking water; xAI has asked for up to 3.7 million gallons a day. Its promised recycling plant stalled in April 2026; xAI now says it will restart in early 2027.
✅ supportedquantitative
c4Notes: ~1,300 premature deaths a year by 2030, ~600,000 asthma cases, ~$20B a year in health costs (UC Riverside & Caltech, The Unpaid Toll, 2024)
Suggested: In a high-growth scenario, air pollution from the power behind US data centers could cause about 1,300 premature deaths and 600,000 asthma symptom cases in 2028, with health costs of up to more than $20B (Han et al., UC Riverside & Caltech, arXiv preprint, rev. 2026).
🟧 partially-supportedattribution
c5Jevons (The Coal Question, 1865): more efficient steam engines made Britain burn more coal
Suggested: In 1865, Jevons saw that Watt’s more efficient steam engines made Britain burn more coal, not less. AI may be doing the same: the IEA projects data centers will use about 945 TWh by 2030.
✅ supportedfactual
c6Notes: Colossus 2 is powered by 27 unpermitted turbines (up to 495 MW) in Southaven, Mississippi, half a mile from homes and a mile from an elementary school; potential emissions >1,700 t NOx, up to 180 t fine particulates and 19 t formaldehyde a year
Suggested: Colossus 2 is powered by unpermitted turbines just over the state line in Southaven, Mississippi: at least 27 (495 MW) when the NAACP sued in April 2026. The complaint alleges they could emit about 1,700 t NOx, 180 t fine particulates and 19 t formaldehyde a year. SELC’s October 2026 estimates are higher.
🟧 partially-supportedquantitative
c7Notes: The NAACP, represented by SELC and Earthjustice, sued under the Clean Air Act; on Oct. 30, 2026 the court denied xAI’s motion to dismiss✅ supportedfactual
c8Notes: Memphis-area counties get an F for ozone from the American Lung Association🟧 partially-supportedfactual
c9Notes: Colossus 1 has run since June 2024; after SELC threatened suit, xAI removed its unpermitted turbines and permitted 15✅ supportedfactual
c10Notes: a wastewater recycling plant at the T.E. Maxson treatment plant was permitted in January 2026 to save up to 13 million gallons a day of aquifer water, and paused construction in April 2026
Suggested: A recycling plant to treat T.E. Maxson wastewater, permitted by the state in January 2026 to spare up to 13 million gallons a day of aquifer water, paused construction in April 2026; xAI now promises a restart by early 2027.
🟧 partially-supportedquantitative

Source: slides/08-power-water-health · open the deck